Bridor UK
15th, September 2017

Project Profile #2

Client: Bridor UK Ltd

Service: Hygenic Floor

Specification: 13m2 in two provers

Location: Aldershot, Hants

Installation Overview:

Bridor's existing floors had been repaired several times by another contractor, and each time only lasted approximately 6 months before falling. Due to the range of different temperatures throughout the day from the kitchen and heavy traffic, we proposed a 9mm Polyurethane screed that would withstand these possible risks of damage.

Special Considerations:

The main consideration was the amount of time that Bridor could withstand being without one of their providers. We were given a provider at 5pm on Friday evening and it had to be back in use for 10am Saturday morning. Whilst we were carrying the works, the rest of the bakery was still operational, so we had ensured not to contaminate food within the premises.

Why L&S Finishes?

As an extremely busy factory, the client was looking for a contractor that could survey, advise on the best solution and then carry out the work with their own fully qualified applicators. L&S Finishes Ltd was that company and exceeded the customer's expectations. Our Company L&S Finishes Ltd filled these requirements and over exceeded the customers’ expectations.