Installation Overview:

As part of Europe’s largest manufactures of sweets, Tangerine Confectionery asked L&S Finishes Ltd to prepare the floor in their shinning and boiling rooms and apply a suitable usage screed for the area. Due to heavy usage of the areas with the new flooring, we proposed a 9mm polyurethane screed with coving at 100mm to wall and floor areas.

Special Considerations:

The main consideration about this project was the timing. The area was shut down for a short period of time, all the machinery was removed, the floor was laid and the machinery was put back into place to start production again for Tangerine Confectionery Ltd. Although the rooms we were doing were not in production the rest of the factory was operational, so we had to ensure that whilst we were carrying out installation we did not create any dust that could have contaminated food within the factory.

Why L&S Finishes?

As an extremely busy factory, the client was looking for a contractor that could survey, advise on the best solution and then carry out the work with their own qualified applicators. Our Company L&S Finishes Ltd filled these requirements and over exceeded the customers’ expectations.